Digital Water Supply and Sewerage Networks Across the Lifecycle, phase 1: Glossary and Classification

Infra      Team selection complete


The concepts, classifications and information content used in the design, construction and maintenance of water supply and sewerage networks are currently fragmented. The quality of source information varies, information often requires manual processing, and design and as-built models frequently remain disconnected from water utilities' network information systems. This makes it more difficult to use and enrich information throughout the network lifecycle and leads to additional work and quality issues.


The project aims to establish a basis for consistent, lifecycle-wide information modelling of water supply and sewerage networks. In the first phase, a glossary covering the key concepts related to water supply and sewerage networks will be developed, and the necessary classifications will be defined, harmonised and supplemented. The work will build on and align existing materials, including the Infra Construction Classification, InfraRYL and InfraBIM Classifications, as well as guidance on surveying, documentation and information exchange in the water services sector.


The resulting shared glossary and classification will enable unambiguous processing of information on water supply and sewerage networks across systems, organisations and lifecycle stages. They will improve quality of source and handover information, reduce manual work and establish a basis for automated information exchange, more effective asset management and the progressively enriched information model to be developed in a later phase of the project.

The project is co-funded by the Finnish Water Utilities Association.

Meet the team

The project team has been selected and their names will be published on this page after their first meeting. Stay up to date with all the latest news by following us on LinkedIn!

Steering group

A steering group has not yet been appointed. A potential decision on establishing a steering group and its composition will be made as the project preparation progresses.

News

a black and white photo of a bunch of metal bars

30.6.2026

RYTV-tekijähaku: Vesihuollon sanasto ja nimikkeistö

Read article 

Project schedule

Tekijähaku on päättynyt ja projektitiimi on valittu. Työ käynnistyy Lokakuun aikana ja tarkempi aikataulu laaditaan projektipäällikön johdolla yhdessä projektitiimin kanssa.